Peugeot405
1. The maintenance instruction
2. Maintenance service
3. Engines
    3.1. Petrol engines
    3.2. Diesel engines
      3.2.1. A technical characteristics
       3.2.2. Engine adjustments
      3.2.3. Removal and installation of the fuel pump of a high pressure
      3.2.4. Installation of the fuel pump of high pressure BOSCH
      3.2.5. Installation of the fuel pump of high pressure Roto Diesel
      3.2.6. Removal of water from the fuel filter
      3.2.7. Removal of air from fuel system
      3.2.8. Removal and atomizer installation
      3.2.9. Check электрически the operated valve of a stop of the engine
      3.2.10. Pump Bosch adjustment
      3.2.11. Pump Roto Diesel adjustment
      3.2.12. Removal and installation турбокомпрессора
       3.2.13. The repair which is not demanding removal of the engine
      3.2.14. Engine removal
      3.2.15. Engine installation
      3.2.16. Engine dismantling
      3.2.17. Engine assemblage
      3.2.18. The oil pump
       3.2.19. Cooling system
      3.2.20. System of release of the fulfilled gases
    3.3. The petrol engine 1,4 дм3
    3.4. Ignition system
4. Fuel system
5. Systems of greasing, cooling
6. Release system
7. Coupling
8. Transmissions
9. Power shafts
10. A steering
11. Suspension brackets
12. Brake system
13. A body
14. An electric equipment


3.2.8. Removal and atomizer installation
PERFORMANCE ORDER
1. It is necessary to use a special key of 27 mm (the adaptation 8.0149).
2. Establish a new fire-resistant lining (a convex surface upwards) and a new copper lining.
3. Tighten an atomizer the moment of 90 Nanometers.