Peugeot405
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Fuel system
    4.1. Fuel system with the carburettor
      4.1.1. The fuel pump
      4.1.2. The gauge of level of fuel in a tank
      4.1.3. A fuel tank
      4.1.4. Removal and carburettor installation
      4.1.5. Carburettor dismantling
      4.1.6. Carburettor work
      4.1.7. Carburettor adjustment
      4.1.8. Starting arrangement OVAD
      4.1.9. The subsequent cooling of the engine
      4.1.10. An inlet collector
      4.1.11. A final collector
    4.2. One-dot systems of injection of fuel
    4.3. Multidot systems of injection of fuel
5. Systems of greasing, cooling
6. Release system
7. Coupling
8. Transmissions
9. Power shafts
10. A steering
11. Suspension brackets
12. Brake system
13. A body
14. An electric equipment


4.1.11. A final collector
THE GENERAL DATA

Arrangement of linings on final channels on a head of the block of cylinders


Removal

PERFORMANCE ORDER
1. To disconnect a hose of giving of hot air in the power supply system of the engine from a final collector.
2. To unscrew screws and to remove a casing from the top part of a final collector.
3. To unscrew nuts of fastening of a reception exhaust pipe to a final collector, then to unscrew a bolt, securing the a reception exhaust pipe to an installation suspension bracket. To disconnect a reception exhaust pipe from a collector, and to remove a lining.
4. At presence to weaken nuts, and to release the amplifier of a steering and a pipe of system of cooling from suspension brackets.
5. To unscrew nuts of fastening of a final collector to a head, to remove a collector and a lining.

Installation on a former place

PERFORMANCE ORDER
Installation is made in sequence, return to removal, taking into account following moments:
      – To check up racks of a final collector on deterioration and corrosion;
      – To check up that interfaced surfaces of a collector and a head pure and dry. To establish a new lining of a collector and a collector, and to tighten nuts of fastening by the demanded moment;
      – To connect a reception exhaust pipe to a final collector.